Construction of Section 3: installation of the ventilated facade started

09-07-2019

Apartments’ internal walls are completed on floors 3-23. At the moment, we continue brickworks at the penthouse level, as well as in commercial premises. The engine plaster of the internal walls from the 3rd (1st residential) to the 19th (17th residential) floors is completed, so that owners and buyers can already see their apartments in a proper form – sales managers are happy to make a tour of the construction for you!

We actively work on the facade construction. Ventilated facade is highly durable and provides a healthy microclimate in the building. It is arranged on an aluminum subsystem with all fasteners made of stainless steel. The layer of basalt insulation is additionally equipped with a wind-hydroprotective membrane. We use the world leader in aluminum profile systems Reynaers and double-glazed windows Pilkington.